About The Project
Isthmus Architecture, Inc., retained by the Mineral Point Railroad Society, undertook pre-design and design services for the restoration of the historic 1857 Mineral Point Depot. Pre-design work included a Phase I environmental report hazardous materials survey, flood plain study, building condition survey, property appraisal and coordination with the Wisconsin Historical Society and the Department of Natural Resources. The design phase included preliminary design, the exploration of several design alternatives, public informational meetings and the development of a construction cost estimate and schedule. Isthmus Architecture also provided complete construction documents for bidding in addition to construction administration and project closeout services.
The project was partially funded by the Wisconsin Department of Transportation through a Federal Transportation Enhancement Grant.